Commercial system cost

Build a turnkey
project budget.

Estimate the installed cost of a new commercial heat pump system from facility capacity, system architecture, project complexity, contingency, and available incentives.

Facility assumptions

Use the same facility inputs as the Commercial Compare tool, then tailor the installation assumptions.

01 Facility and schedule
02 System and installation
Estimated turnkey installed cost

Equipment, installation, controls, engineering, commissioning, and contingency included.

Net cost after incentives
Estimated system capacity
Turnkey cost per ton

What the turnkey estimate includes

These planning allowances allocate the calculated total. Replace them with contractor proposals before making an investment decision.

Heat pump equipment
Mechanical installation
Electrical work
Controls and integration
Rigging and site logistics
Engineering and commissioning
Project contingency

Screening estimate only. Actual turnkey cost depends on equipment selection, structural work, electrical service, ductwork, controls, phasing, prevailing wage requirements, permitting, and site conditions. Capacity uses the greatest of existing tonnage, entered cooling capacity, or heating capacity converted at 12 MBH per ton.