Commercial system cost
Build a turnkey
project budget.
Estimate the installed cost of a new commercial heat pump system from facility capacity, system architecture, project complexity, contingency, and available incentives.
—
Equipment, installation, controls, engineering, commissioning, and contingency included.
Net cost after incentives—
Estimated system capacity—
Turnkey cost per ton—
Budget allocation
What the turnkey estimate includes
These planning allowances allocate the calculated total. Replace them with contractor proposals before making an investment decision.
Heat pump equipment—
Mechanical installation—
Electrical work—
Controls and integration—
Rigging and site logistics—
Engineering and commissioning—
Project contingency—
Screening estimate only. Actual turnkey cost depends on equipment selection, structural work, electrical service, ductwork, controls, phasing, prevailing wage requirements, permitting, and site conditions. Capacity uses the greatest of existing tonnage, entered cooling capacity, or heating capacity converted at 12 MBH per ton.